Project: Photovoltaic Power Plant at MINERVA BOSKOVICE, a.s.
Reg. No.: CZ.31.3.0/0.0/0.0/22_001/0002648
MINERVA BOSKOVICE, a.s. is implementing a project during 2023–2024 as part of the National Recovery Plan, Photovoltaic Systems Program with/without Energy Storage, titled "Photovoltaic Power Plant at MINERVA BOSKOVICE, a.s."
The project is co-financed by the European Union.
The main goal of the project is to reduce energy consumption and increase the share of renewable energy usage at the MINERVA BOSKOVICE, a.s. facility. Achieving this goal will improve energy efficiency and result in energy and financial savings for the applicant. The installation of the photovoltaic power plant will positively impact the environment by reducing the use of electricity from the distribution grid, increasing the share of renewable energy sources, and decreasing carbon dioxide emissions.
The project includes the installation of photovoltaic panels with a capacity of 600 kWp. It does not involve the acquisition of energy storage.